One tree-planting event down, one to go in March

Small dog with yellow vest

We had a good turnout at our workday at River Park on Saturday. The weather was terrific. We got 6 trees planted - adding to the 5 that we planted back in November. We then applied a heavy layer of bark mulch to all 11 trees and picked up hundreds of downed branches from around the park. In addition, we removed invasive ivy from several more trees along the riverbank.

A very productive day. Many thanks to all who attended!

We're all volunteers at Build Lebanon Trails, from the Board of Directors down to the folks who show up in yellow vests. If you attend workdays regularly and would like to get more involved with Build Lebanon Trails, let us know! We'll give you an Elite Volunteer vest of your own.

If you'd like another chance to plant trees this month, please join us again this week at the Marks Slough Trail for a major collaborative event planting 36 trees. See the event for details.

November Workday at River Park Loop Trail

Trail workers pose for photo with BLT banner

Five, large, potted trees were planted along the newly constructed River Park Loop Trail on Saturday, November 8, by BLT members and volunteers. The trees were selected for both their summer and fall color, as well as their eventual size at maturity. They include Scarlet Oak, ginkgo, and three types of maple. The trees were pruned, staked, and large plastic tubes were inserted for watering during the summer months.

Meanwhile, six volunteers hand-dug a 6-foot-by-9-foot area for a handicapped-accessible bench pad overlooking the river. Gravel was compacted in the excavated site which is now ready for cement to be poured. The new bench will be one of four benches being installed on the new trail and will have an outstanding view of the river.

Invasive ivy was trimmed from trees along the river, and broken branches were picked up along the newly paved, winding trail.

The next workday is planned for March 2026. We plan to plant six more trees by the River Park Loop Trail.

Many thanks to everyone who participated!

Erosion Repair at Cheadle Lake

City workers standing in canal

The following is a guest article written by Jason Williams, Public Works Director of the City of Lebanon, about some important erosion control work recently done by his crew.

The City of Lebanon recently completed critical repairs along the North Shore Trail at Cheadle Lake to prevent potential structural failure of the canal embankment. Without this repair, the trail would have been required to close for safety reasons. The potential failure could have been catastrophic, as it may have caused Cheadle Lake to empty into the canal.

This important project was completed in partnership with the City of Albany and the Federal Energy Regulatory Commission (FERC). As required by FERC, the repair design was reviewed and approved in advance to ensure long-term safety and stability. We have estimated these repairs for this project at approximately $55,000.

The damage to the canal bank was caused primarily by erosion from wildlife activity and individuals allowing their pets to access the canal from the trail. To help prevent future erosion and protect this vital infrastructure, we ask the public to take the necessary precautions to keep their dogs from swimming in the canal or even traversing the canal bank. Please use only the designated and safe access points to enjoy Cheadle Lake.

Through continued care and cooperation from the community, we can preserve the safety, beauty, and accessibility of the North Shore Trail for years to come.

Jason Williams
Public Works Director
City of Lebanon | 305 W Oak Street | Lebanon, OR 97355

44 North Credit Union and the Eagle Scout Trail

Group from 44 North Credit Union at the Eagle Scout Trail

Lebanon's trails are owned and maintained by the City of Lebanon. Build Lebanon Trails is a nonprofit group that assists the City in acquiring land that fits the City's trail plan, funding and managing trail construction, and assisting with trail maintenance.

There are other groups that assist with trail maintenance on a regular basis. Here's an example of how one business has made a segment of the Lebanon trail system their own.

44 North Credit Union (formerly called Linn-Co Federal Credit Union) has adopted the Eagle Scout Trail as part of its community service initiatives. This trail is unpaved and nearly a mile long, running parallel to the Old Mill Trail, starting at Gill's Landing and ending at Riverview Park.  They have work parties four times a year: cleaning the area, cutting ivy off of the trees, picking up trash, and anything else that needs attending to.

Part of the Eagle Scout Trail was constructed by Thor Deacon and fellow scouts and families in 1994 as Thor's Eagle Scout project.  When the Old Mill Trail was being constructed, Build Lebanon Trails extended the Eagle Scout Trail  through to Riverview Park so folks could have a way to get to that area.

Below is a gallery of photos provided by the 44 North team of a recent trail cleanup. They speak louder than words.

Earth Day 2023 Trail Work Day photos

Some participants at the trail workday

From Darryl Black, BLT board director and organizer of the BLT trail workday events:

"Very long and successful Earth Day workday at the three separate mulching locations. Dwane and I had great help at Bob Smith from the Cub Scouts who showed up with 5 adults and 7 kids and stayed an amazing 4 hours."

Thanks to everyone who participated at every location! Our volunteers are what make BLT trails stay beautiful. Here are some photos from the hard workers at Bob Smith Memorial Park.

Linn-Co volunteers join BLT’s Trail Work Day

Linn-Co volunteers for trail work pose with BLT Board director Darryl Black

On February 18, volunteers from Linn-Co and other volunteers from our community worked to free tree trunks from the English ivy strangling them. English ivy grows around and up tree trunks and eventually constricts the trunk's growth and injures the bark, which then allows pests and diseases to enter the tree.

Linn-Co is sponsoring BLT for the annual Cheadle Lake Run 5/10K Fun Run and Kids Obstacle Dash. A big thank you to Linn-Co, its employees, and our community volunteers for improving our trails and our community!

Trail Work Day, February 2019

2019-02-05 Trail work day group

Despite the grim weather predictions for a winter storm, 17 trail enthusiasts geared up with warm clothes, assorted tools and positive attitudes for the Build Lebanon Trails trail enhancement work day on Saturday February 9, 2019.  The sun broke through the dark clouds as new Elite Volunteer Scott Grasley assigned tasks, gave the obligatory safety speech and led the caravan of volunteers out to the Island Loop Trail at Cheadle Lake.

Good conversations, new friendships and the pleasure of working towards a common goal kept everyone warm in spite of the wind chill factor.

Volunteers pruned trees, spread mulch, trimmed the overgrowth around resting benches and netted trash out of the lake.  With so many helping hands, it only took a couple of hours to make a significant impact on the appearance of the trails out on the fingers in the lake. A couple of bald eagles perched on a tall snag to inspect the effort.

Several trail users who were out enjoying the morning took the time to stop and thank the volunteers for their efforts. Knowing that the hard work of planning, developing and maintaining the Lebanon trails system is appreciated by our community is what keeps us moving forward puts the smiles on our faces.

Happy Trails!